绝对斜拉 大宗材料预算表" "材料名称","工程用量","单位","单价","幅动系数","总价","现时单价"," 总计","5-8月实际用量","5-8月实际价格" "钢筋",,"吨",,1 "Φ10",56.645,"吨",3600,1,203922 "Φ12",606.781,"吨",3500,1,2123733.5 "Φ14",1,"吨",3400,1,3400 "Φ16",441.737,"吨",3300,1,1457732.1 "Φ18",111.1,"吨",3300,1,366630 "Φ20",255.72,"吨",3300,1,843876 "Φ22",167.99,"吨",3300,1,554367 "Φ25",219.61,"吨",3300,1,724713 "Φ28",0.1,"吨",3350,1,335 "Φ30",29.7,"吨",3350,1,99495 "Φ32",393.05,"吨",3350,1,1316717.5 "线材",,"吨",3400,1,0 "Φ8",49,"吨",3530,1,172970 "Φ10",162.58,"吨",3580,1,582036.4 "Φ12",3.69,"吨",3700,1,13653 "小计",2498.703,,,,8463580.5 "钢绞线",251.13,"吨",5300,1,1330989 "锚具",,"套",,1,0 "m15-4j",960,"套",74,1,71040 "m15-5j",320,"套",92.5,1,29600 "bm15-5j",600,"套",95,1,57000 "m15-7j",60,"套",129.5,1,7770 "m15-6j",20,"套",111,1,2220 "m15p-6j",20,"套",102,1,2040 "m15-19j",216,"套",370.5,1,80028 "m15p-19j",32,"套",323,1,10336 "m15-12j",36,"套",222,1,7992 "m15-14j",152,"套",273,1,41496 "ygm-32",384,"套",55,1,21120 "lzm7-139",,"套",,1,0 "lzm7-151",,"套",,1,0 "lzm7-187",,"套",,1,0 "lzm7-211",,"套",,1,0 "小计",,,,,330642 "橡胶支座",,"套",,1,0 "柴油",104.577,"吨",5680,1,593997.36 "沙子",10803.19,"方",24,1,259276.56 "石子",14404.25,"方",40,1,576170 "减水剂",127.168,"吨",3350,1,426012.8 "水泥",,"吨"," ",1," " "R325",3774.74,"吨",225,1,849316.5 "R425",4058.55,"吨",260,1,1055223 "小计",,,,,1904539.5 "斜拉索",,"套",,1,0 "模板",,"吨",,1,0 "合计",,,,1,0 "项目","月租费","月数",,,"总价" "25T吊机",20000,16,,,320000 "30装载机",7000,16,,,112000 "2部罐车及拌和站"
|